Tag: Rough Mechanicals

Changing Things Up

Posted on

The roof is completed at Ross in Plymouth, Michigan and it looks great. The homeowners went with a charcoal color and architectural timberline shingles.Framing is completed for Ross and we are now installing the rough mechanicals for the home. The rough-in plumbing, electrical, and HVAC are what lays out what and where everything is going […]

Read more

Creative Addition

Posted on

With Framing completed, things here on Green Valley Road in Plymouth, Michigan are really starting to take off.The rough plumbing, electrical, and HVAC have all been installed and passed inspection.Chris from Arctic Insulation, was able to come in and insulate the entire home.The home is now ready for the next step which is drywall.Keep following […]

Read more

Adding On

Posted on

Things are moving along here on Palmer. Everything from the rough plumbing to electrical, and HVAC has been installed in the home. Insulation was installed this week as well. Once the inspection is completed we can move onto getting the home drywalled.

Read more

New Beginnings

Posted on

Arthur street has changed a lot since we first started excavating back in February. It went from a blank canvas to looking like a house. There’s still more to added but it’s neat to look back and see where it once was to what it is now.Things are speeding up here at Arthur, rough mechanicals […]

Read more

Family Home

Posted on

The installation of siding went smoothly over at Jenner Place in Downtown Plymouth. The homeowners went with a blue Hardy siding that complements the home’s charming cape cod style.

Read more

Small Space, Big Living

Posted on

The inside of Roe Street has and is going through major changes. Since framing has been completed windows were installed and the rough mechanicals are in the process of being installed. The rough plumbing, electrical and HVAC has been installed throughout the home. After the rough mechanicals passed inspection, insulation was then added to home […]

Read more

Family Home

Posted on

The inside of Jenner Place has been prepped and is now ready for the rough mechanicals to be installed. The rough mechanicals is the groundwork that helps to define the different functions for the rooms in the home. Over the next month HVAC, Electrical and plumbing will be installed.

Read more