New Beginings

Posted on

Framing of the first floor is underway on Arthur street. Our crew at DJL Builders, Inc., have gotten the outside walls up and are in the process of framing the inside of the home. Our guys are working meticulously and laying the groundwork for the rooms on the first floor.

Read more

Small Space, Big Living

Posted on

The inside of Roe Street has and is going through major changes. Since framing has been completed windows were installed and the rough mechanicals are in the process of being installed. The rough plumbing, electrical and HVAC has been installed throughout the home. After the rough mechanicals passed inspection, insulation was then added to home […]

Read more

Small Space, Big Living

Posted on

In the process of Making Roe Street more attractive, windows were installed this week. It may not seem like much but these windows are a flattering look to this cape cod style home.

Read more

New Beginings

Posted on

We’re excited to announce that we’re ready to begin framing our new build on Arthur Street. With the beams set into place, our crew at DJL Builders, Inc., are framing up the floors and setting the footprint for the first floor layout. Keep up with New Beginnings to see all the transformations from start to […]

Read more

Family Home

Posted on

The inside of Jenner Place has been prepped and is now ready for the rough mechanicals to be installed. The rough mechanicals is the groundwork that helps to define the different functions for the rooms in the home. Over the next month HVAC, Electrical and plumbing will be installed.

Read more

Family Home

Posted on

It’s neat to see how much this home has changed from when it first started till now. Installing the roof on Jenner Street has taken a little longer than expected. The weather wasn’t on our side this week and pushed us back by a few days but we still managed to get the roof sheeted […]

Read more

Small Space, Big Living

Posted on

So far, the end of February and the beginning of March has hit us with an array of all the different seasons. The craziest of all was the wind. Luckily none of our workers were blown. Our guys have propelled through all this abnormal weather to ensure we that we stay on schedule. Framing is […]

Read more

Small Space, Big Living

Posted on

Our guys are diligently working on framing Roe Street. The weather was great for framing but then it began to rain. In order to keep Roe on schedule, our crew prepared as many walls as possible so once the rain stopped framing could resume.

Read more

Family Home

Posted on

The temperatures outside have been ghastly and challenging but the second-floor exterior walls and framing of the roof are now completed. With the roof framed, it will then get sheeted and shingled.

Read more

Family Home

Posted on

Ron, Dave, Tim and Henry are working away to install floor and deck joists for the second floor. The weather wasn’t always on our side this week but despite weather delays we are prevailing through.

Read more