February 6, 2018

With Framing completed, things here on Green Valley Road in Plymouth, Michigan are really starting to take off.

The rough plumbing, electrical, and HVAC have all been installed and passed inspection.

Chris from Arctic Insulation, was able to come in and insulate the enti...

January 30, 2018

Despite the snow and freezing temperatures, our framers at DJL Builders are working hard here on Ross Street. They were able to get the exterior walls up and the inside of the home framed.

Right now they're working on getting the trusses up and the roof f...

December 12, 2017

We here at DJL Builders are working on a new project in Plymouth, Michigan. Here on Linden we are redesigning the inside and adding on to maximize the homes true potential.

Demolition for the inside and outside of the home has been completed and is being prepped for fra...

July 31, 2017

Now that framing has been completed and the roof installed, our guys can now turn their attention to the inside of Palmer Street.

Now that windows and the roof have been installed, siding will be next to go on the outside of the home.

Even without the siding, this additi...

July 13, 2017

Arthur street has changed a lot since we first started excavating back in February. It went from a blank canvas to looking like a house. There's still more to added but it's neat to look back and see where it once was to what it is now.

Things are speeding up here at Ar...

June 8, 2017

Framing is almost completed her on Palmer street.

Our guys at DJL Builders, Inc., are framing up Palmers roof and getting it prepped to be sheeted and singled.

June 5, 2017

Our guys at DJL Builders, Inc., are still in the process of framing Arthur Street. The first floor is completed and they've moved on up to framing the outside walls and rooms for the second floor.

They also working on framing the roof and getting it prepped to be sheete...

May 29, 2017

The installation of siding went smoothly over at Jenner Place in Downtown Plymouth.

The homeowners went with a blue Hardy siding that complements the home's charming cape cod style.

May 25, 2017

First floor framing has been completed on Palmer and now our guys at DJL Builders, Inc., are taking on the second floor.

Our guys are preparing the upper level of the home to be demoed and then framed out for the addition.

May 18, 2017

Framing of the first floor is underway on Arthur street. Our crew at DJL Builders, Inc., have gotten the outside walls up and are in the process of framing the inside of the home.

Our guys are working meticulously and laying the groundwork for the rooms on the first flo...